Digital Infrastructure stories
Rising data centre investment in Canada is driving demand for specialist managers, as GagaMuller plans to add 40 roles over 12 months.
Traditional data centre designs are being overtaken as AI clusters push rack loads to 50-100kW and demand liquid cooling, faster builds and more power.
In emergencies, vital medical details can be useless if they are trapped behind apps, passwords or a dead connection.
Nations risk handing strategic control to foreign cloud giants as AI demand exposes how few countries can supply the compute power needed.
Developers are weighing power, water and land constraints in the north, as 12 data centre projects could reshape regional planning over decades.
Network resilience worries have pushed 72% of organisations to delay or scale back AI and edge projects, a survey found.
The new platform starts with five sites and spare capacity, giving government, financial services and enterprise clients room to grow without disruption.
Firms that miss NIS2's 24-hour alert risk fines and public censure, while those that report first can win regulator help and advice.
The appointment signals a push to expand across the UK, Ireland and the Nordics while modernising sites and easing scrutiny over energy use.
Telecoms chiefs are already seeing more measurable value from AI, while tech bosses face growing pressure to prove faster payback from spending.
The move signals Stellanor's push to expand in the UK and Ireland while facing tighter scrutiny over energy use, grid access and local impact.
The sale of overseas tower assets would cut borrowings and leave Axiata and Khazanah with equal control of EDOTCO Malaysia.
Rising AI demand is forcing data centres to redesign power systems for faster load swings, tighter efficiency and near-perfect uptime.
The restructuring would hand Axiata about RM2.2 billion in gross proceeds and cut its leverage, while preserving joint control of EDOTCO Malaysia.
AI-driven cyberattacks could now hit smaller businesses and household services at machine speed, widening the fallout from outages and breaches.
Smaller firms could help ease Canada's digital infrastructure bottlenecks, but independent network operators still face steep technical and financial barriers.
Demand for downloads and play pushed rural broadband traffic 14% above Gigaclear's previous record on the evening before the UK release.
The move strengthens Valarian's push into government and defence work, as Britain wrestles with who controls sensitive data and critical AI systems.
Just 45% of utilities and network operators rate their regions as well prepared, underscoring concern that US grids may struggle to absorb rising demand.
The project could boost Egypt's New Capital with secure AI computing capacity as developers tie a $750 million data centre to Forbes International Tower.